Stage I familiarization of citizens with the terms, place and procedure of public discussion;

Stage II conducting public discussion (discussions, social surveys, collecting opinions of residents, land users and owners of real estate and other methods) on the draft general plan of the settlement;

Stage III analysis of public opinion based on fixed results of public discussion;

Stage IV informing the public about the results of public discussion in the media, including on the Internet;

b) the possibility of carrying out a public examination of the master plans of settlements for compliance with the rights and legitimate interests of legal entities and individuals, the interests of society and the state is being introduced;

c) a mechanism is being introduced for developing an alternative general plan of a settlement or making changes (adjustments) to it at the initiative of subjects of public control who do not agree with the proposed general plan of a settlement;

d) the organization of public discussion of the draft general plans of settlements is entrusted to the local public authorities.

5. Establish that from March 1, 2021:

a) the construction and reconstruction of buildings and structures, including individual residential buildings, with a number of floors of more than two floors (excluding the ground floor), a height of more than 12 meters from the ground surface and (or) a total area of more than 500 square meters are carried out with the mandatory examination of the project documentation of the object and the establishment of state construction control of the object by territorial inspections on control in the field of construction under the Ministry of Construction;

b) it is prohibited:

developers individuals and legal entities, with the exception of organizations engaged in construction and installation work as the main activity, independently (by economic means), without concluding a construction contract with a construction organization, to carry out the construction and reconstruction of buildings and structures with more than two floors (excluding the ground floor), a height of more than 12 meters from the surface of the earth and (or) a total area of more than 500 square meters;

implementation of the construction of multi-storey apartment buildings on land plots located in the functional zones of the territories of settlements not intended for this type of construction;

increase in the number of storeys (superstructure) of existing buildings and structures, including individual housing, without examination of project documentation;

increase in the number of storeys of buildings and structures under construction (by changing the project documentation) without carrying out an examination of the modified project documentation;

c) a positive expert opinion on project documentation is recognized as valid if it is entered by an expert organization in the "Unified Register of Expert Opinions" of the National Information System "Transparent Construction", with the exception of expert opinions on project documentation containing information constituting a state secret.

6. To allow the Ministry of Construction to carry out public procurement of works (goods, services) for the development and processing of national regulatory documents in the field of technical regulation, state standards, as well as the adaptation of foreign regulatory documents in the field of urban development under direct contracts, followed by posting information about them on a special information portal of public procurement no later than three days from the date conclusions.

7. The Ministry of Construction (B. I. Zakirov), together with interested ministries and departments, should ensure:

within two months, the submission to the Cabinet of Ministers of a draft regulatory act providing for the improvement of the mechanism of legal regulation in the field of individual housing construction, paying special attention to ensuring seismic and fire safety in this area;

by December 1, 2020, submitting for approval to the Cabinet of Ministers a draft Temporary Regulation on the procedure for conducting electronic public procurement in the field of construction;

until June 1, 2021, the development of a Unified administrative building regulations providing for the regulation of all construction processes, from primary permits, the development of design estimates, its expertise to the commissioning of facilities;

By June 1, 2021, proposals will be submitted to the Cabinet of Ministers on the phased implementation of insurance principles in design, survey and construction activities based on the study of international best practices;

by August 1, 2021, the implementation of the anticorruption compliance system of the Ministry of Construction, and by January 1, 2022 obtaining a certificate of compliance with the international standard ISO:37001 (Anti-Corruption Management System);

until September 1, 2021, the creation of an electronic system "Attentive Citizen", which allows citizens to independently receive information about objects under construction, identify illegal construction, record (in the form of photo and video materials) detected violations at construction sites and send them to the authorized bodies for control in the field of construction;

Until March 1, 2022, the development of the "Zero Injuries on Construction Sites" Program based on the implementation of the Concept of the International Social Security Association (ISSA);

until July 1, 2022, the development and implementation of a territorial "design code" taking into account the intended purpose of elements of the urban environment, traditional architecture and culture, as well as natural and climatic conditions of the area;

starting from 2022, every year until December 1, the development and submission to the Cabinet of Ministers of a draft regulatory act on the approval of the Program of Measures for the implementation of this Strategy next year with an in-depth analysis of the implementation of the tasks of the current year.

8. The Ministry of Employment and Labor Relations (N. B. Khusanov) and the Ministry of Foreign Affairs (A. H. Kamilov), together with interested ministries and departments, to study the expediency of the Republic of Uzbekistan's accession to the International Labor Organization Convention No. 167 on Occupational Safety and Health in Construction (Geneva, June 20, 1988 year) and submit reasonable proposals to the Cabinet of Ministers based on the results.

9. The Ministry of Finance (T. A. Ishmetov), the Ministry of Economic Development and Poverty Reduction (I. I. Norkulov) annually, when forming the parameters of the State Budget, provide for the allocation of the necessary funds in the areas of implementation of the measures specified in the «Roadmap» for the implementation of the Strategy.

10. Transfer the Main Department of Construction of the city of Tashkent and the departments of construction of districts of the city of Tashkent to the Ministry of Construction.

The Ministry of Construction (B. I. Zakirov) within two months to review the tasks, functions and organizational structures of the Main Department of Construction of the city of Tashkent and the departments of construction of districts of the city of Tashkent and make proposals to the Administration of the President of the Republic of Uzbekistan.

Ваша оценка очень важна

0
Шрифт
Фон

Помогите Вашим друзьям узнать о библиотеке

Скачать книгу

Если нет возможности читать онлайн, скачайте книгу файлом для электронной книжки и читайте офлайн.

fb2.zip txt txt.zip rtf.zip a4.pdf a6.pdf mobi.prc epub ios.epub fb3